Graceton substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 8 with terminal status (shown greyed).
0active projects
0active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| X3-068 | Graceton 230kV | 230 | 678 | Gas | Withdrawn |
| V4-002 | Graceton 230kV | 230 | 575 | Gas | Withdrawn |
| B48 | Graceton 230kV | 230 | 550 | Gas | Withdrawn |
| L06 | Graceton 230kV | 230 | 550 | Gas | Withdrawn |
| P05 | Graceton 230kV | 230 | 550 | Gas | Withdrawn |
| S23 | Graceton 230kV | 230 | 550 | Gas | Withdrawn |
| AG2-587 | Graceton 230 kV | 230 | 20 | Hybrid | Withdrawn |
| T170 | Graceton | n/r | 20 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.