TMI-Peach Bottom substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
H14 TMI-Peach Bottom 500kV 500 1,060 Gas Withdrawn
G14 TMI-Peach Bottom 500kV 500 610 Gas Withdrawn
D20 TMI-Peach Bottom 500kV 500 550 Gas Withdrawn
I03 TMI-Peach Bottom 500kV 500 70 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.