TMI-Peach Bottom substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| H14 | TMI-Peach Bottom 500kV | 500 | 1,060 | Gas | Withdrawn |
| G14 | TMI-Peach Bottom 500kV | 500 | 610 | Gas | Withdrawn |
| D20 | TMI-Peach Bottom 500kV | 500 | 550 | Gas | Withdrawn |
| I03 | TMI-Peach Bottom 500kV | 500 | 70 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.