Substation Scout

Bennett-Farmingdale substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
X4-031 Skudera Solar Farm 34 0 Solar In Service
Z2-092 Bennett-Farmingdale 34.5kV 34.5 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.