Lakewood substation interconnection queue
4 active projects totalling 543 MW in the PJM queue, plus 2 with terminal status (shown greyed).
4active projects
543active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| A55 | Lakewood NUG | 230 | 500 | Gas | In Service |
| AH2-269 | Lakewood 230 kV | 230 | 100 | Battery | Withdrawn |
| R23 | Ocean Peaking Power (Lakewood CT1, CT2) | 230 | 20 | Gas | In Service |
| AD1-059 | Lakewood Cogeneration Plant | 230 | 14.9 | Gas | In Service |
| B13 | Lakewood 230kV | 230 | 9 | Gas | Withdrawn |
| AB2-014 | Lakewood Cogeneration Plant | 230 | 8.1 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.