Lakewood substation interconnection queue
4 active projects totaling 543 MW in the PJM queue, plus 2 with terminal status (shown grayed).
6 PJM queue filings name Lakewood as the point of interconnection, all in Ocean County, NJ.
Target commercial operation dates as filed run from Dec 2005 to Jun 2026 (5 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| A55 | Lakewood NUG | 230 | 500 | Gas | In Service | Dec 2005 |
| AH2-269 | Lakewood 230 kV | 230 | 100 | Battery | Withdrawn | Jun 2026 |
| R23 | Ocean Peaking Power (Lakewood CT1, CT2) | 230 | 20 | Gas | In Service | Jan 2007 |
| AD1-059 | Lakewood Cogeneration Plant | 230 | 14.9 | Gas | In Service | Sep 2019 |
| B13 | Lakewood 230kV | 230 | 9 | Gas | Withdrawn | n/r |
| AB2-014 | Lakewood Cogeneration Plant | 230 | 8.1 | Gas | In Service | Sep 2017 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Lakewood (JCPL, 4 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Other PJM queue substations in Ocean County, NJ
- Oyster Creek: 1 active, 35 MW of 6 filed
- Manitou-Pleasant Plains: 1 active, 8.2 MW of 2 filed
- Lakehurst: 1 active, 3 MW of 3 filed
- Larrabee: none active of 11 filed
- Cedar: none active of 8 filed
- Manchester: none active of 2 filed
- Oyster Creek II: none active of 2 filed