Substation Scout

Lakewood substation interconnection queue

4 active projects totalling 543 MW in the PJM queue, plus 2 with terminal status (shown greyed).

4active projects
543active MW
6total filed
Queue IDProjectkVMWResourceStatus
A55 Lakewood NUG 230 500 Gas In Service
AH2-269 Lakewood 230 kV 230 100 Battery Withdrawn
R23 Ocean Peaking Power (Lakewood CT1, CT2) 230 20 Gas In Service
AD1-059 Lakewood Cogeneration Plant 230 14.9 Gas In Service
B13 Lakewood 230kV 230 9 Gas Withdrawn
AB2-014 Lakewood Cogeneration Plant 230 8.1 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.