Atlantic substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
G37 Atlantic n/r 471 Gas Withdrawn
A42 Atlantic 230 kV 230 449 Gas Withdrawn
E04 Atlantic 230kV 230 24 Gas Withdrawn
Q19 Atlantic 34.5 kV 34.5 1 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.