Great Adventure-Great Adventure Tap substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Great Adventure-Great Adventure Tap as the point of interconnection, all in Monmouth County, NJ.

Target commercial operation date as filed: Dec 2016 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
W4-045 Red Valley Solar Farm 34.5 3.4 Solar Withdrawn Dec 2016
W3-158 Millstone Solar Farm 34 3 Solar Withdrawn Dec 2016

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Monmouth County, NJ

All 79 PJM queue filings in Monmouth County, NJ.