Substation Scout

Allenwood-Larrabee 2 substation interconnection queue

1 active project totaling 1 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Allenwood-Larrabee 2 as the point of interconnection, all in Monmouth County, NJ.

Target commercial operation dates as filed run from Mar 2023 to Sep 2023 (2 filings).

1active projects
1active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-213 Allenwood-Larrabee 2 34.5 kV 34.5 3.1 Solar Withdrawn Mar 2023
AF1-260 Lakewood-Farmingdale Road Solar Farm 34.5 1 Solar In Service Sep 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Monmouth County, NJ

All 79 PJM queue filings in Monmouth County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first