Oyster Creek substation interconnection queue

2 active projects totalling 264.3 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
264.3active MW
6total filed
Queue IDProjectkVMWResourceStatus
B04 Oyster Creek n/r 800 Gas Withdrawn
A45 Oyster Creek 230 kV 230 752 Gas Withdrawn
AE1-020 Ocean Wind 230 229.3 Offshore Wind Suspended
AI2-325 Oyster Creek 230 kV 230 178.7 Offshore Wind Withdrawn
AA1-097 Oyster Creek 230kV 230 100 Gas Withdrawn
C01-1937 Oyster Creek 230 kV 230 35 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.