Substation Scout

Larabee - Atlantic substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-068 Larabee - Atlantic 230 kV 230 250 Battery Withdrawn
AI2-069 Larabee - Atlantic 230 kV 230 250 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.