Lakehurst substation interconnection queue
1 active project totalling 3 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
3active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| E23 | Lakehurst 34.5kV | 34.5 | 50 | Gas | Withdrawn |
| O20 | Ocean Energy LF | 34.5 | 9.4 | Gas | Deactivated |
| C01-1981 | Lakehurst 34.5 kV | 34.5 | 3 | Gas | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.