Substation Scout

Oyster Creek II substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AD2-122 Oyster Creek 230 kV II 230 635 Not reported Withdrawn
AE2-232 Oyster Creek 230 kV II 230 112.4 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.