Larrabee Collector Station substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Larrabee Collector Station as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from Oct 2029 to Feb 2030 (2 filings).

Transmission owner as filed: JCPL (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-431 Larrabee Collector Station 230 kV 230 2,083 Offshore Wind Withdrawn Feb 2030
AH1-557 Larrabee 230 kV IV 230 228.8 Offshore Wind Withdrawn Oct 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Larrabee Collector Station (JCPL, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Same name on other Substation Scout pages

Other sources that print a substation named “Larrabee Collector Station” in NJ. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Atlantic County, NJ

All 93 PJM queue filings in Atlantic County, NJ, including 6 more substations.

Other PJM queue substations in Monmouth County, NJ

All 79 PJM queue filings in Monmouth County, NJ.