Hornerstown-Windsor substation interconnection queue

1 active project totalling 1.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
1.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
W3-159 Monmouth West Solar I 34 4.6 Solar Withdrawn
X1-085 Upper Freehold Solar 34 1.9 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.