Bennett-Farmingdale 2 substation interconnection queue
1 active project totalling 0.7 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
0.7active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-263 | Bennett-Farmingdale 2 34.5 kV | 34.5 | 0.7 | Solar | Withdrawn |
| AG1-563 | AG1-563 | 34.5 | 0.7 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.