Manitou-Pleasant Plains substation interconnection queue
1 active project totalling 8.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
8.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-212 | Manitou-Pleasant Plains 34.5 kV | 34.5 | 10.8 | Solar | Withdrawn |
| AE1-142 | Toms River Solar | 34.5 | 8.2 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.