Substation Scout

Manitou-Pleasant Plains substation interconnection queue

1 active project totalling 8.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
8.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-212 Manitou-Pleasant Plains 34.5 kV 34.5 10.8 Solar Withdrawn
AE1-142 Toms River Solar 34.5 8.2 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.