Washington substation interconnection queue
3 active projects totaling 53.3 MW in the PJM queue.
Target commercial operation dates as filed run from Oct 2015 to Jun 2019 (3 filings).
3active projects
53.3active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AA2-141 | Washington Energy Facility | 345 | 45 | Gas | In Service | Aug 2016 |
| AA1-014 | Washington Energy Facility | 345 | 5 | Gas | In Service | Oct 2015 |
| W3-044 | McCullough Road Solar Farm | 34.5 | 3.3 | Solar | In Service | Jun 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Washington County, OH
- Beverly: 2 active, 41 MW of 2 filed
Other PJM queue substations in Warren County, NJ
- Pequest River: 3 active, 165.9 MW of 5 filed
- Pohatcong: 1 active, 80 MW of 2 filed
- Kittatinny: 1 active, 20 MW of 3 filed
- Phillipsburg: 2 active, 4.1 MW of 8 filed
- Washington-Mobile Chemical: 1 active, 3.8 MW of 2 filed
- Stewartsville: 1 active, 3.6 MW of 2 filed
- Broadway-Stewartsville: 2 active, 3.3 MW of 2 filed
- Gilbert-Morris Park: 1 active, 3.2 MW of 4 filed
- Foul Rift: 1 active, 0.8 MW of 2 filed
- Columbia: 1 active, 0.5 MW of 4 filed
- Belvidere: 1 active, 0 MW of 5 filed
- Mansfield: none active of 4 filed
- Morris Park: none active of 4 filed
- Andover-Kittatinny: none active of 3 filed
- Broadway: none active of 3 filed
- Newburgh: none active of 3 filed
- Flanders: none active of 2 filed
- Franklin #2: none active of 2 filed
- Hackettstown: none active of 2 filed
- Lopatcong: none active of 2 filed
All 113 PJM queue filings in Warren County, NJ, including 4 more substations.