Belvidere substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AA2-067 Belvidere n/r 10 Gas Withdrawn
AD1-129 Cherry Valley Solar Project, LLC 34 7.5 Solar Withdrawn
AC2-007 Belvidere n/r 7 Solar Withdrawn
X1-003 Belvidere n/r 0.8 Solar Withdrawn
X3-029 CHP Belvidere Generation Facility n/r 0 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.