Substation Scout

Andover-Kittatinny substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
W3-146 Kerrs Corner Road Solar Farm 34.5 3.8 Solar Withdrawn
W4-091 Andover-Kittatinny 34.5kV 34.5 3.8 Solar Withdrawn
X3-083 Andover Solar Farm 34 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.