Foul Rift substation interconnection queue

1 active project totalling 0.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
U2-094 Foul Rift 34.5kV 34.5 7.2 Solar Withdrawn
U2-059 Belvidere SP 13 0.8 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.