Foul Rift substation interconnection queue
1 active project totalling 0.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
0.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U2-094 | Foul Rift 34.5kV | 34.5 | 7.2 | Solar | Withdrawn |
| U2-059 | Belvidere SP | 13 | 0.8 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.