Substation Scout

Morris Park substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
W4-055 Morris Park 12kV 12 3 Solar Withdrawn
W3-152 Morris Park 12kV 12 1 Solar Withdrawn
X3-025 Morris Park 12kV 12 0.7 Solar Withdrawn
AC1-018 Strykers Road Solar Farm 12.5 0.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.