Broadway substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W1-055 | Broadway 34.5kV | 34.5 | 3.8 | Solar | Withdrawn |
| W3-154 | Schanzlin Solar Farm | 12 | 0.6 | Solar | Withdrawn |
| AE2-028 | State Route 57 Solar | 12.5 | 0.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.