Substation Scout

Broadway substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
W1-055 Broadway 34.5kV 34.5 3.8 Solar Withdrawn
W3-154 Schanzlin Solar Farm 12 0.6 Solar Withdrawn
AE2-028 State Route 57 Solar 12.5 0.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.