Substation Scout

Mansfield substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

Target commercial operation dates as filed run from Oct 2011 to Dec 2023 (3 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
D24 Mansfield 115kV 115 500 Gas Withdrawn n/r
AG2-614 Mansfield 12 kV 12 4.3 Solar Withdrawn Dec 2023
X1-008 Mansfield n/r 2.9 Solar Withdrawn Oct 2011
X3-035 Mansfield n/r 0 Solar Withdrawn Jul 2012

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Tioga County, PA

All 21 PJM queue filings in Tioga County, PA.

Other PJM queue substations in Warren County, NJ

All 113 PJM queue filings in Warren County, NJ, including 4 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first