Stewartsville substation interconnection queue

1 active project totalling 3.6 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
3.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
V2-010 Stewartsville 34.5kV 34.5 3.8 Solar Withdrawn
AB2-058 Stewartsville Solar Farm 34.5 3.6 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.