Newburgh substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Newburgh as the point of interconnection, all in NJ.
Target commercial operation dates as filed run from Nov 2010 to Jun 2018 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W2-006 | Newburgh 12kV | 12 | 0.4 | Solar | Withdrawn | Nov 2010 |
| W3-006 | Newburgh 12kV | 12 | 0.4 | Solar | Withdrawn | Jun 2011 |
| AC2-144 | 59 Newburgh | 12.5 | 0 | Battery | Withdrawn | Jun 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Morris County, NJ
Other PJM queue substations in Warren County, NJ
- Pequest River: 3 active, 165.9 MW of 5 filed
- Pohatcong: 1 active, 80 MW of 2 filed
- Washington: 3 active, 53.3 MW of 3 filed
- Kittatinny: 1 active, 20 MW of 3 filed
- Phillipsburg: 2 active, 4.1 MW of 8 filed
- Washington-Mobile Chemical: 1 active, 3.8 MW of 2 filed
- Stewartsville: 1 active, 3.6 MW of 2 filed
- Broadway-Stewartsville: 2 active, 3.3 MW of 2 filed
- Gilbert-Morris Park: 1 active, 3.2 MW of 4 filed
- Foul Rift: 1 active, 0.8 MW of 2 filed
- Columbia: 1 active, 0.5 MW of 4 filed
- Belvidere: 1 active, 0 MW of 5 filed
- Mansfield: none active of 4 filed
- Morris Park: none active of 4 filed
- Andover-Kittatinny: none active of 3 filed
- Broadway: none active of 3 filed
- Flanders: none active of 2 filed
- Franklin #2: none active of 2 filed
- Hackettstown: none active of 2 filed
- Lopatcong: none active of 2 filed
All 113 PJM queue filings in Warren County, NJ, including 4 more substations.