Columbia substation interconnection queue
1 active project totalling 0.5 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
0.5active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W3-024 | Columbia 138kV | 138 | 19.4 | Wind | Withdrawn |
| W2-044 | Columbia 138kV | 138 | 13.1 | Wind | Withdrawn |
| Q22 | Great Bear Hydro | 34.5 | 0.5 | Hydro | In Service |
| AB1-022 | Columbia 115kV | 115 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.