1 active project totalling 3.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
3.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
W4-046 Hengst Solar Farm 34.5 3.8 Solar In Service
Z2-094 Washington-Mobile Chemical 34kV 34 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.