Phillipsburg substation interconnection queue

2 active projects totalling 4.1 MW in the PJM queue, plus 6 with terminal status (shown greyed).

2active projects
4.1active MW
8total filed
Queue IDProjectkVMWResourceStatus
AI2-440 Phillipsburg 115 kV 115 20 Hybrid Withdrawn
AG1-144 Phillipsburg 34.5 kV 34.5 12 Solar Withdrawn
W3-151 Phillipsburg 34.5kV 34.5 6.1 Solar Withdrawn
W4-073 Hamptons at Pohatcong Solar Farm 34.5 3 Solar In Service
X1-006 Phillipsburg n/r 1.8 Solar Withdrawn
X4-047 Phillipsburg n/r 1.5 Solar Withdrawn
W1-127 Harmony Solar Farm 12.5 1.1 Solar In Service
X2-081 Phillipsburg n/r 0.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.