Phillipsburg substation interconnection queue

2 active projects totaling 4.1 MW in the PJM queue, plus 6 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jan 2012 to Dec 2027 (8 filings).

2active projects
4.1active MW
8total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-440 Phillipsburg 115 kV 115 20 Hybrid Withdrawn Dec 2027
AG1-144 Phillipsburg 34.5 kV 34.5 12 Solar Withdrawn Jun 2022
W3-151 Phillipsburg 34.5kV 34.5 6.1 Solar Withdrawn Mar 2012
W4-073 Hamptons at Pohatcong Solar Farm 34.5 3 Solar In Service Dec 2019
X1-006 Phillipsburg n/r 1.8 Solar Withdrawn Jan 2012
X4-047 Phillipsburg n/r 1.5 Solar Withdrawn Dec 2013
W1-127 Harmony Solar Farm 12.5 1.1 Solar In Service Sep 2015
X2-081 Phillipsburg n/r 0.6 Solar Withdrawn Feb 2012

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Centre County, PA

All 53 PJM queue filings in Centre County, PA.

Other PJM queue substations in Clearfield County, PA

All 53 PJM queue filings in Clearfield County, PA.

Other PJM queue substations in Warren County, NJ

All 113 PJM queue filings in Warren County, NJ, including 4 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first