Substation Scout

Kittatinny substation interconnection queue

1 active project totaling 20 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Kittatinny as the point of interconnection, all in Warren County, NJ.

Target commercial operation dates as filed run from Mar 2014 to Jul 2029 (3 filings).

1active projects
20active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-511 Mt Vernon Solar 230 30 Hybrid Withdrawn Jul 2029
AG2-172 Kittatinny 230 kV 230 30 Hydro Withdrawn Jun 2022
Z1-050 Yards Creek Pumped Storage Hydro-electric Generating Station 230 20 Hydro In Service Mar 2014

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Kittatinny (JCPL, 10 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Other PJM queue substations in Warren County, NJ

All 113 PJM queue filings in Warren County, NJ, including 4 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first