Substation Scout

Kittatinny substation interconnection queue

1 active project totalling 20 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
20active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-511 Mt Vernon Solar 230 30 Hybrid Withdrawn
AG2-172 Kittatinny 230 kV 230 30 Hydro Withdrawn
Z1-050 Yards Creek Pumped Storage Hydro-electric Generating Station 230 20 Hydro In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.