Orchard substation interconnection queue

1 active project totalling 415 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
415active MW
5total filed
Queue IDProjectkVMWResourceStatus
AH2-333 Orchard 230kV 230 415 Battery Withdrawn
C01-2234 Orchard 230 kV 230 415 Battery Active
W1-011 Orchard 230kV 230 26.6 Solar Withdrawn
V4-040 Orchard 230kV 230 7.6 Solar Withdrawn
W3-075 Orchard 230kV 230 7.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.