Quinton Township substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
W1-068 Quinton Township n/r 7.6 Solar Withdrawn
W2-101 Quinton Township n/r 7.6 Solar Withdrawn
W2-100 Quinton Township n/r 3.8 Solar Withdrawn
W1-048 Quinton Township n/r 1.9 Solar Withdrawn
X2-028 Quinton Township 12kV 12 1.1 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.