Upper Pittsgrove substation interconnection queue

1 active project totaling 0.9 MW in the PJM queue, plus 3 with terminal status (shown grayed).

4 PJM queue filings name Upper Pittsgrove as the point of interconnection, all in Salem County, NJ.

Target commercial operation dates as filed run from Sep 2012 to Sep 2023 (4 filings).

1active projects
0.9active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
X1-016 Upper Pittsgrove 12kV 12 7.6 Solar Withdrawn Jan 2013
X2-101 Upper Pittsgrove 138kV 138 2.3 Wind Withdrawn Sep 2012
AI2-203 Upper Pittsgrove 138 kV 138 1 Solar Withdrawn Mar 2023
AF1-262 Pittsgrove Solar 12 0.9 Solar In Service Sep 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Salem County, NJ

All 114 PJM queue filings in Salem County, NJ, including 5 more substations.