Upper Pittsgrove substation interconnection queue

1 active project totalling 0.9 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
0.9active MW
4total filed
Queue IDProjectkVMWResourceStatus
X1-016 Upper Pittsgrove 12kV 12 7.6 Solar Withdrawn
X2-101 Upper Pittsgrove 138kV 138 2.3 Wind Withdrawn
AI2-203 Upper Pittsgrove 138 kV 138 1 Solar Withdrawn
AF1-262 Pittsgrove Solar 12 0.9 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.