Woodstown substation interconnection queue

1 active project totalling 0.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
W2-051 Woodstown 69kV 69 7.6 Solar Withdrawn
AE2-272 Pilesgrove Solar 12 0.8 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.