Substation Scout

Churchtown - Upper Pittsgrove substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-616 Churchtown - Upper Pittsgrove 138 kV 138 32.4 Solar Withdrawn
AH1-641 Churchtown - Upper Pittsgrove 138kV 138 7 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.