Substation Scout

Churchtown - Upper Pittsgrove substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Churchtown - Upper Pittsgrove as the point of interconnection, all in Salem County, NJ.

Target commercial operation date as filed: Dec 2028 (2 filings).

Transmission owner as filed: AEC (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-616 Churchtown - Upper Pittsgrove 138 kV 138 32.4 Solar Withdrawn Dec 2028
AH1-641 Churchtown - Upper Pittsgrove 138kV 138 7 Solar Withdrawn Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05AG2-616Terminal status32.4 Active → Withdrawn
2026-10-05AH1-641Terminal status7 Active → Withdrawn

Other PJM queue substations in Salem County, NJ

All 114 PJM queue filings in Salem County, NJ, including 5 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →