0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
G27 Churchtown 230kV 230 750 Gas Withdrawn
Q26 Churchtown 230kV 230 550 Gas Withdrawn
AA1-108 Deepwater 230 158 Gas Withdrawn
AF2-023 Churchtown 69 kV 69 17 Battery Withdrawn
AE1-115 Churchtown 69 kV 69 10 Battery Withdrawn
AG1-111 Churchtown 69 kV 69 10 Battery Withdrawn
AG2-335 Churchtown 69 kV 69 10 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.