Salem substation interconnection queue
3 active projects
totalling 369.2 MW in the PJM queue, plus 2 with terminal status (shown greyed).
3 active projects
369.2 active MW
5 total filed
Queue ID Project kV MW Resource Status
AH1-710
Salem 500kV
500
228.2
Nuclear
Active
H17
Salem 1 & 2
500
115
Nuclear
In Service
C07
Salem 1 & 2
500
26
Nuclear
In Service
K01
Mannington Mills Units 1,2,3
69
8
Other
Deactivated
X1-083
Salem 12kV
12
2.3
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.