Pedricktown substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| A56 | Pedricktown 230kV | 230 | 500 | Gas | Withdrawn |
| W1-039 | PCLP Facility | 230 | 10 | Gas | Deactivated |
| X1-024 | Pedricktown 12kV | 12 | 5.7 | Solar | Withdrawn |
| W2-070 | Pedricktown 12kV | 12 | 3.8 | Solar | Withdrawn |
| W1-084 | Pedricktown 12kV | 12 | 1.9 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.