Pedricktown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
A56 Pedricktown 230kV 230 500 Gas Withdrawn
W1-039 PCLP Facility 230 10 Gas Deactivated
X1-024 Pedricktown 12kV 12 5.7 Solar Withdrawn
W2-070 Pedricktown 12kV 12 3.8 Solar Withdrawn
W1-084 Pedricktown 12kV 12 1.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.