Fenwick Creek Solar
PJM queue ID AG1-254
Fenwick Creek Solar (AG1-254) is listed in the PJM interconnection queue as a 25.3 MW hybrid project in Atlantic County, NJ. The filing names Salem-Woodstown as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 1, 2028.
| Queue ID | AG1-254 |
|---|---|
| Project name | Fenwick Creek Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Salem-Woodstown |
| Point of interconnection | Salem-Woodstown 69 kV |
| County | Atlantic |
| State | NJ |
| Voltage | 69 kV |
| Capacity | 25.3 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2028-09-01 |
| Source dataset | serial |
Same substation and county
Salem-Woodstown substation: 2 requests in the PJM queue, 1 active totaling 25.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| W4-088 | Salem-Woodstown 69kV | 3.8 | Solar | Withdrawn |
Atlantic, NJ: 93 requests in the PJM queue, 12 active totaling 301.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 38 |
| MW capacity | 25.3 |
| MFO | 38 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.