Pilesgrove substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
W2-072 Pilesgrove 12kV 12 7.6 Solar Withdrawn
W3-016 Pilesgrove n/r 7.6 Solar Withdrawn
W3-017 Pilesgrove n/r 7.6 Solar Withdrawn
V4-037 Pilesgrove 12kV 12 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.