Oldmans Township substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
W2-025 Oldmans Township n/r 7.6 Solar Withdrawn
X2-047 Oldmans Township 12kV 12 3.8 Solar Withdrawn
W2-047 Oldmans Township n/r 2.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.