TSS 971 Prairie substation interconnection queue
2 active projects totaling 400 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name TSS 971 Prairie as the point of interconnection, all in McHenry County, IL.
Target commercial operation dates as filed run from Dec 2030 to Dec 2031 (3 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: ComEd (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1857 | TSS 971 Prairie 345 kV | 345 | 200 | Battery | Active | Dec 2031 |
| C01-1858 | TSS 971 Prairie 345 kV | 345 | 200 | Battery | Active | Dec 2031 |
| C01-1859 | TSS 971 Prairie 345 kV | 345 | 138 | Solar | Withdrawn | Dec 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-28 | C01-1859 | Terminal status | 138 | Active → Withdrawn |
Other PJM queue substations in McHenry County, IL
- Pleasant Valley: 3 active, 800 MW of 5 filed
- Silver Lake (Red Bus): 2 active, 360 MW of 2 filed
- Silver Lake: 2 active, 240 MW of 7 filed
- McHenry: 2 active, 10 MW of 2 filed
- Marengo: 1 active, 0 MW of 6 filed
- Crete: none active of 4 filed
- Belvidere-Marengo: none active of 3 filed
- Garden Prairie: none active of 2 filed