Substation Scout

Mount Rose substation interconnection queue

1 active project totaling 0.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).

Target commercial operation dates as filed run from May 2016 to Dec 2023 (2 filings).

1active projects
0.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AA2-058 Hopewell Valley Solar 13 0.3 Hybrid In Service May 2016
AH2-067 Mount Rose 13 kV 13 0 Solar Withdrawn Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Mercer County, NJ

All 28 PJM queue filings in Mercer County, NJ.

Other PJM queue substations in Cook County, IL

All 45 PJM queue filings in Cook County, IL.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first