Mount Rose substation interconnection queue
1 active project totaling 0.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).
Target commercial operation dates as filed run from May 2016 to Dec 2023 (2 filings).
1active projects
0.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AA2-058 | Hopewell Valley Solar | 13 | 0.3 | Hybrid | In Service | May 2016 |
| AH2-067 | Mount Rose 13 kV | 13 | 0 | Solar | Withdrawn | Dec 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Mercer County, NJ
- Pleasant Valley: 3 active, 800 MW of 5 filed
- Hopewell: 3 active, 188 MW of 12 filed
- Mercer: 2 active, 180 MW of 5 filed
- Crosswicks: 2 active, 161 MW of 3 filed
- Trenton: 1 active, 3 MW of 6 filed
- Lawrence: 1 active, 0.3 MW of 4 filed
- Windsor: none active of 5 filed
- Yardville: none active of 3 filed
- Penns Neck: 1 active, 0 MW of 2 filed
- Princeton University: 1 active, 0 MW of 2 filed
Other PJM queue substations in Cook County, IL
- Calumet: 3 active, 400 MW of 4 filed
- Chicago Heights: 1 active, 250 MW of 5 filed
- Burnham: 2 active, 200 MW of 2 filed
- Crawford: none active of 3 filed
- Bloom: none active of 2 filed
- Clybourn: none active of 2 filed
- Hegewisch: none active of 2 filed
- I.C. Air Rights: none active of 2 filed
- River EC: none active of 2 filed
- Robbins: none active of 2 filed
Site Scanner