Hopewell substation interconnection queue

3 active projects totalling 188 MW in the PJM queue, plus 9 with terminal status (shown greyed).

3active projects
188active MW
12total filed
Queue IDProjectkVMWResourceStatus
C01-1643 Hopewell 230 kV 230 150 Battery Active
AB2-152 Hopewell 230kV 230 54 Gas Withdrawn
U2-057 Hopewell 34.5kV 34.5 47.6 Other Withdrawn
Y2-077 Hopewell Cogeneration Facility (HCF) 230 30 Gas In Service
AH1-064 Hopewell 34.5kV 34.5 8 Battery Withdrawn
AH1-065 Churchill Storage Solutions LLC 34.5 8 Battery Withdrawn
R31 Hopewell 230kV 230 8 Gas Withdrawn
W2-009 Hopewell 230kV 230 8 Gas Withdrawn
Y2-074 Hopewell Cogeneration Facility (HCF) 230 8 Gas In Service
AH1-066 Churchill Storage Solutions LLC 34.5 4 Battery Withdrawn
AE2-095 Hopewell 26 kV 26 0 Hybrid Withdrawn
U1-032 Hopewell 230kV 230 0 Coal Deactivated

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.