Marengo substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
AD2-176 Marengo 138kV 138 60 Solar Withdrawn
AE1-201 Marengo 34 kV 34 16.4 Solar Withdrawn
AF1-330 Marengo 34.5 kV 34.5 16.4 Solar Withdrawn
AD1-016 Marengo Solar, LLC n/r 7.6 Solar Withdrawn
AD2-024 Marengo 34 kV 34 7.6 Solar Withdrawn
AA2-123 Marengo Battery Storage 34 0 Battery In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.