Lawrence substation interconnection queue

1 active project totalling 0.3 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
0.3active MW
4total filed
Queue IDProjectkVMWResourceStatus
AH2-018 Lawrence 12.47 kV 12.5 6 Solar Withdrawn
X1-113 Bristol-Myers 26 3.8 Solar Withdrawn
W4-061 Lawrence 26kV 26 3.4 Solar Withdrawn
W4-058 Rider University 13 0.3 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.