Lawrence substation interconnection queue
1 active project totalling 0.3 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
0.3active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH2-018 | Lawrence 12.47 kV | 12.5 | 6 | Solar | Withdrawn |
| X1-113 | Bristol-Myers | 26 | 3.8 | Solar | Withdrawn |
| W4-061 | Lawrence 26kV | 26 | 3.4 | Solar | Withdrawn |
| W4-058 | Rider University | 13 | 0.3 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.