Substation Scout

Lawrence substation interconnection queue

1 active project totaling 0.3 MW in the PJM queue, plus 3 with terminal status (shown grayed).

Target commercial operation dates as filed run from Dec 2011 to May 2023 (4 filings).

1active projects
0.3active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH2-018 Lawrence 12.47 kV 12.5 6 Solar Withdrawn May 2023
X1-113 Bristol-Myers 26 3.8 Solar Withdrawn Dec 2013
W4-061 Lawrence 26kV 26 3.4 Solar Withdrawn Jun 2012
W4-058 Rider University 13 0.3 Solar In Service Dec 2011

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Clearfield County, PA

All 53 PJM queue filings in Clearfield County, PA.

Other PJM queue substations in Mercer County, NJ

All 28 PJM queue filings in Mercer County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first