Belvidere-Marengo substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-330 | Belvidere-Marengo | n/r | 208.8 | Battery | Withdrawn |
| AE2-321 | McHenry County Solar Project | 138 | 67 | Solar | Withdrawn |
| AF1-048 | Belvidere-Marengo | n/r | 31.3 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.