Belvidere-Marengo substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-330 Belvidere-Marengo n/r 208.8 Battery Withdrawn
AE2-321 McHenry County Solar Project 138 67 Solar Withdrawn
AF1-048 Belvidere-Marengo n/r 31.3 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.