Silver Lake (Red Bus) substation interconnection queue

2 active projects totalling 360 MW in the PJM queue.

2active projects
360active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1463 Silver Lake (Red Bus) 345 kV 345 240 Battery Active
C01-1462 Silver Lake (Red Bus) 345 kV 345 120 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.