Silver Lake (Red Bus) substation interconnection queue
2 active projects totalling 360 MW in the PJM queue.
2active projects
360active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1463 | Silver Lake (Red Bus) 345 kV | 345 | 240 | Battery | Active |
| C01-1462 | Silver Lake (Red Bus) 345 kV | 345 | 120 | Battery | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.