Substation Scout

Mercer, NJ interconnection queue

8 active projects totalling 183.7 MW in the PJM queue, plus 20 with terminal status (shown greyed).

8active projects
183.7active MW
28total filed
Queue IDProjectkVMWResourceStatus
D26 Mercer 230kV 230 550 Gas Withdrawn
AF2-071 Windsor 230 kV 230 100 Battery Withdrawn
C01-1327 Mercer 230 kV 230 100 Battery Active
AF1-237 Lamberton Road Battery 230 80 Battery Engineering and Procurement
AF1-109 Pleasant Valley 230 kV 230 20 Hybrid Withdrawn
AH2-254 Not reported n/r 5 Hybrid Withdrawn
W3-078 East Windsor Solar Farm 34.5 4.9 Solar Withdrawn
X1-090 BKB Properties 138 3.8 Solar Withdrawn
X1-113 Bristol-Myers 26 3.8 Solar Withdrawn
X2-070 Hightstown n/r 3.8 Solar Withdrawn
W4-061 Lawrence 26kV 26 3.4 Solar Withdrawn
W1-121 Property #6 13 3 Solar In Service
AE2-018 Laurence 13.2 kV 13.2 2.3 Solar Withdrawn
Y1-009 Yardville 13kV 13 1.5 Solar Withdrawn
X1-055 Robbinsville n/r 0.8 Solar Withdrawn
AB1-118 Trenton 13kV 13 0.7 Gas Withdrawn
AA2-058 Hopewell Valley Solar 13 0.3 Hybrid In Service
W4-058 Rider University 13 0.3 Solar In Service
AC2-009 Pennington 13 kV Solar 13 0.1 Hybrid In Service
AA2-066 Princeton Hospital NRG Energy Center 13 0 Gas In Service
AC1-170 New Canton 12.47V n/r 0 Battery Withdrawn
AC1-199 Mercer 480v I n/r 0 Gas Withdrawn
AC1-200 Mercer 480v II n/r 0 Gas Withdrawn
AE2-083 Forrester Solar 34.5 kV 34.5 0 Solar Withdrawn
AE2-095 Hopewell 26 kV 26 0 Hybrid Withdrawn
AE2-198 Not reported n/r 0 Solar Withdrawn
AF2-168 Princeton University Generating Facility 69 0 Hybrid In Service
C01-1887 Princeton University 69 kV 69 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.