Mercer substation interconnection queue
2 active projects totalling 180 MW in the PJM queue, plus 3 with terminal status (shown greyed).
2active projects
180active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| D26 | Mercer 230kV | 230 | 550 | Gas | Withdrawn |
| C01-1327 | Mercer 230 kV | 230 | 100 | Battery | Active |
| AF1-237 | Lamberton Road Battery | 230 | 80 | Battery | Engineering and Procurement |
| AI2-469 | Mercer 12.5 kV | 12.5 | 5.8 | Solar | Withdrawn |
| AI2-470 | Mercer 12.5 kV | 12.5 | 5.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.