Substation Scout

Milford Solar Farm

PJM queue ID AD2-070

Milford Solar Farm (AD2-070) is listed in the PJM interconnection queue as a 3.2 MW solar project in Hunterdon County, NJ. The filing names Gilbert-Morris Park as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2020.

Queue IDAD2-070
Project nameMilford Solar Farm
Status (as published)In Service
SubstationGilbert-Morris Park
Point of interconnectionGilbert-Morris Park 34.5kV
CountyHunterdon
StateNJ
Voltage34.5 kV
Capacity3.2 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2020-06-01
Source datasetserial

Same substation and county

Gilbert-Morris Park substation: 4 requests in the PJM queue, 1 active totaling 3.2 MW.

Queue IDProjectMWResourceStatus
AD2-006Gilbert-Morris Park 34.5 kV3.2SolarWithdrawn
AD2-037Gilbert-Morris Park 34.5 kV3.2SolarWithdrawn
W3-001Alpha Solar Farm3SolarWithdrawn

Hunterdon, NJ: 89 requests in the PJM queue, 26 active totaling 863.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy7.5
MW capacity3.2
MFO7.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first