Carson-Rogers Rd substation interconnection queue

1 active project totalling 67.7 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
67.7active MW
5total filed
Queue IDProjectkVMWResourceStatus
AE1-068 Carson-Rogers Rd 500 kV 500 322.1 Solar Withdrawn
AE2-233 Carson-Rogers Rd 500 kV 500 67.7 Solar Withdrawn
AF1-069 Cassius Blue Solar 500 67.7 Hybrid Engineering and Procurement
AG1-014 Carson-Rogers Rd 500 kV 500 0 Battery Withdrawn
AG1-015 Carson-Rogers Rd 500 kV 500 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.